• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Legat Architects Main Logo

Legat Architects

  • About Us
    • Services
    • Team
  • Careers
  • Insights
  • Contact Us
  • Projects
    • Learning
    • Wellness
    • Community

Grant Wood Elementary School Construction Underway in Bettendorf

August 21, 2017 Learning, News by Legat Architects

New school design brings more space, more light, more community use, and more flexible learning opportunities for Bettendorf community

[Bettendorf, IA] – Construction has begun on Grant Wood Elementary School, which will replace a 57-year-old facility of the same name. The old Grant Wood was dark and operationally inefficient, plus it had severe space shortages that restricted the curriculum and limited community use.

The 62,500-square-foot replacement school is nearly 70% larger than the previous facility. It allows an increase from two to three sections and is designed to hold 450+ students (100 more than the old school).

Designed by Legat Architects and to be built by Estes Construction, the new Grant Wood incorporates 21st century learning concepts into a more traditional school design. Among its features are multipurpose areas, an “Innovation Spine,” a 3,100-square foot student commons, and an energy-efficient HVAC system.

“The design of the new elementary school provides much-needed improvements in learning areas for all students,” said John Cain, principal of Grant Wood. “Classrooms are significantly larger, breakout areas are located throughout the building, and large areas have been designed for small group work as well as adult learning.”

Construction started in July, 2017. The school will open in August, 2018 and the project will be completed in November, 2018. The new school is getting built behind the old school. When construction finishes, the old school will be demolished for adequate parking and green space.

Within the Innovation Spine, a library and STEM makerspace encourage exploration and teamwork.

A Closer Look

The glass Innovation Spine, located at the heart of the school, separates the grades 1-5 and PK-K wings and fills the corridor with natural light. Spaces within the spine include the commons, cafeteria, learning stair, library, and a STEM makerspace.

The learning stair just off the entry is a flexible activity and gathering area.

The learning stair (off the entry) welcomes spontaneous gathering and presentations, and leads to the lower level commons/cafeteria. The first floor makerspace supports robot building, hands-on science, and learning through discovery. It offers work areas with device plug-in, markerboard tables, and writeable wall space.

The combined cafeteria/gymnasium in the old school created scheduling conflicts and restricted community use. The new Grant Wood has a separate cafeteria and a gym nearly twice as large as the old one. This not only expands the PE program, but also welcomes community recreation programs.

Lower level and first floor plans.

The Legat design team is exploring ways to integrate the work of the school’s namesake, an Iowa native and a renowned artist, into the project. Ideas include using the color palette of his paintings and adding digitized versions of his paintings as a layer to glass and wall surfaces.

Cain said, “The new Grant Wood will stand as a flexible community resource with collaboration and discovery at its core.”

Contact us to learn more about preK-12 design or comment below to share your thoughts on this post.

Share

In the News

CommunityEmployee Insights

Train station design: regaining the power of rail

tinley park train station legat architects feature
Employee InsightsLearning

Explore before you build: the space utilization study

classroom utilization legat feaure
CommunityEmployee Insights

Transit’s Next Step: The Multi-Modal Facility

moline multi modal legat architects feature

Looking For More? Check Out The Full Insights.

View All Chevrone right

Get Our Newsletter

Sign up for Legat’s newsletter to uncover design tips, news, and all things architecture.

Reader Interactions

Comments

  1. Anita Hanson says

    October 31, 2018 at 12:16 am

    My daughter started school here 1965. Can’t believe she is 58 Gold girl scout rank when 15., married 39 yrs 2 Eagle Scout sons . Now my great nephew attends Grant Wood, but that family is not close now. But that is ok. Good luck to your teachers. Hope they are extra ordinary And please secure the children and keep them safe, God bless.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Footer

Legat Logo Mark
  • About
    • Services
    • Team
  • Careers
  • Insights
  • Projects
    • Learning
    • Wellness
    • Community

Chicago, IL

312 258 9595

Columbus, OH

614 228 7758

Gurnee, IL

847 662 3535

Iowa City, IA

319 450 0510

Oak Brook, IL

630 990 3535

Quad Cities, IA/IL

309 517 5536

Social link iconSocial link iconSocial link iconSocial link iconSocial link iconSocial link icon
  • File Storage
  • Sitemap
  • Privacy Policy

©

2023

Legat Architects. All rights reserved.