• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Legat Architects Main Logo

Legat Architects

  • About Us
    • Our Story
    • Services
    • Special Projects
    • Team
  • Careers
  • Insights
  • Contact Us
  • Projects
    • Learning
    • Wellness
    • Community

Mundelein and Glenbard West High School Additions Featured at Illinois’ Largest PreK-12 Education Conference

January 15, 2018 Learning, News by Legat Architects

Suburban high schools achieve advanced science/classroom environments while covering opposite ends of the aesthetic spectrum

Two strikingly different styles of architecture characterize the recent science and classroom additions at Glenbard West High School (Glen Ellyn, Illinois) and Mundelein High School (Mundelein, Illinois). The former, featuring a warm, brick-dominant traditional exterior, not only advances Glenbard West’s science programs, but also honors the Collegiate Gothic style of the 100-year-old school. Conversely, Mundelein High School’s addition, with its metal and glass façade, is a contemporary facility that establishes the school as a regional leader in STEM education and workforce preparation. Despite these aesthetic differences, both additions display sophisticated interior environments that enrich their schools’ curricula.

Both additions (designed by Legat Architects) achieved recognition at the 2017 Joint Annual Conference of the Illinois Association of School Boards (IASB), Illinois Association of School Administrators (IASA), and Illinois Association of School Business Officials (Illinois ASBO). The event’s Educational Environments Exhibition (EEE) included the Glenbard West and Mundelein additions among the 25 Illinois school projects on display. The EEE applauds Illinois school district construction projects for design that meets 21st century education needs while achieving energy efficiency and safety.

The Mundelein High School expansion was also one of only three projects that received an “Award of Merit” for outstanding educational design. A “blind” jury of architects and superintendents judged the awards entries.

This year, the Chicago-based Joint Annual Conference drew nearly 10,000 attendees including Illinois school district superintendents, board members, and other leaders.

The design team for the Glenbard West High School addition (left) selected materials to complement, but not copy the materials of the existing façade (right).

Glenbard West High School

The 28,800-square-foot addition and 12,500-square-foot renovation at Glenbard West respond to overcrowding, consolidate the school’s science department, and encourage learning outside the classroom. Science lab design allows everything from cross-curricular collaboration and student-driven projects to research and one-on-one instruction. The renovation also vastly improved wheelchair accessibility.

Features
  • Eight new biology and chemistry labs
  • Glass-enclosed stairwell unites addition, leads to green roof
  • Three-story glass bridge organizes addition, connects to existing structure, and reflects nature and surrounding buildings to become virtually invisible
  • Addition enhances visual arts curriculum with photography room, digital editing room, and traditional dark room
  • Arts courtyard accessible from classrooms gives students outdoor area to sculpt, sketch, or paint, and displays outdoor furniture crafted from trees
  • Addition organizes support services around indoor loading dock and houses mechanical equipment used to provide air conditioning throughout the existing building
  • Old labs repurposed into larger classrooms
On each floor within the Glenbard West High School glass bridge, light-filled spaces called “collaboration nodes” (with adjacent departmental resource centers and offices) encourage student interaction with faculty.

A large hill plays an important part in Glenbard West High School’s identity—its sports teams are even called “Hilltoppers.” Functional needs helped decide where the addition would be placed, but stepping down the hill helped minimize the addition’s impact. All trees and plants were cataloged and many were relocated prior to construction.

The Walsh Group was the general contractor for the Glenbard West expansion.

The Mundelein High School expansion, designed in response to a constrained site, tops a one-story classroom wing and extends over an existing courtyard, thus creating three distinct courtyards.

Mundelein High School

Mundelein High School’s 55,000-square-foot addition enabled local business partnerships, university mentoring opportunities, and community outreach programs. Windows along the first floor corridor display a STEM lab, a Project Lead The Way lab, and a “Business Incubator.” Flexible classrooms and labs occupy the second and third floors.

Representatives from Mundelein High School and Legat Architects accept an Award of Merit for the school’s science and classroom addition at the 2017 Joint Annual Conference.

Features

  • Addition designed as a teaching tool—labs display mechanical systems, while corridors feature an exposed structural system with tile bases.
  • STEM lab offers chemistry islands, movable worktables, and a “Think Tank” where students gather for multimedia presentations.
  • In the Project Lead The Way (PLTW) lab, perimeter computer stations and mobile worktables allow students to build machines controlled by software that they create.
  • STEM and PLTW labs share a machine lab, a locker room, an interior window, and a courtyard for outdoor experiments.
  • Business Incubator immerses students in an authentic corporate environment with access to multimedia tools.
  • Glass-enclosed conference room with views to a courtyard sets the tone for student meetings with local business leaders and university mentors.
  • Second floor classrooms open to breakout space that expands for events.
The Mundelein High School addition includes a second-level extension that curves over a science courtyard and houses classroom-accessible breakout space separated by glass dividers.

A “travel corridor” within the Mundelein addition uses black tiles that reference tiled feature walls in the existing facility. The corridor creates a curving connection between the commons and the expansion. The travel theme extends up a main stair that unites the addition’s three levels, then culminates in the “experiment balcony.”

The construction manager for the Mundelein High School addition was IHC Construction Companies.

Learn more about the additions at Glenbard West High School and Mundelein High School.

Contact us to learn more about preK-12 design or comment below to share your thoughts on this post.

Share

In the News

CommunityEmployee Insights

Train station design: regaining the power of rail

tinley park train station legat architects feature
CommunityNews

Hyatt Place and Hyatt House Hotels in East Moline Bring Upscale Lodging to The Bend on the Mighty Mississippi

Hyatt Place Hyatt House East Moline Rendering
News

In Memory: Alan F. Bombick, AIA (1955 – 2016)

Alan F Bombick feature

Looking For More? Check Out The Full Insights.

View All Chevrone right

Get Our Newsletter

Sign up for Legat’s newsletter to uncover design tips, news, and all things architecture.

Footer

Legat Logo Mark
  • About
    • Our Story
    • Services
    • Special Projects
    • Team
  • Careers
  • Insights
  • Projects
    • Learning
    • Wellness
    • Community

Chicago, IL

312 258 9595

Columbus, OH

614 228 7758

Gurnee, IL

847 662 3535

Iowa City, IA

319 450 0510

Oak Brook, IL

630 990 3535

Quad Cities, IA/IL

309 517 5536

Social link iconSocial link iconSocial link iconSocial link iconSocial link iconSocial link icon
  • Branding Assets
  • File Storage
  • Sitemap
  • Privacy Policy

©

2025

Legat Architects. All rights reserved.

Website designed by ArtVersion.