Fast-track renovation transforms two floors into behavioral health space
A 22,000-square-foot makeover converts vacant medical-surgical spaces on two floors into a 32-bed expansion of OSF HealthCare Sacred Heart Medical Center – Urbana’s behavioral health program. The spaces support specialized psychiatric care for young adults and older adults.
Legat completed design and documentation in just four months. Typically, a project of this caliber would still be in the design phase after four months. Construction finished in just eight months. Several factors helped accelerate the project and reduce costs. The design, for instance, retained most of the existing layout. Additionally, high-impact drywall covered existing walls to avoid more labor-intensive wall assemblies.
A risk assessment allowed the design to prioritize safety: Interior windows have safety frames and safety glazing. Anti-ligature fixtures and hardware enhance safety throughout the space.
The project also upgrades HVAC systems. Induction units were replaced with more efficient units that tie into existing building systems. New, custom-built air-handling units replaced older equipment in the penthouse.



























